Business licence checker: licences and approvals by industry
Choose your industry to see the licences and approvals new businesses in that industry usually need, which agency handles each one, what it costs where the agency publishes a fee, and when it applies.
This is planning information, not legal advice. Requirements depend on your exact activities and premises; confirm with the agency before you act.
Car workshop
- Plan bays, hoists, parts store and waste store Usually needed
Lay out work bays and hoists, compressor and air lines, parts storage, a separate area for waste oil and used parts, and customer reception.
- Get landlord approval for fit-out Usually needed
Submit drawings, hoist foundation details and contractor information before works start.
- Check fire safety submissions with a Qualified Person Usually needed
Ask your contractor whether works need SCDF plan approval or can be lodged as minor works, especially if you add a spray booth.
SCDF’s Fire Code requires a motor vehicle workshop to be separated from other parts of the same building by compartment walls and floors with at least a 2-hour fire resistance rating (4 hours in a basement).
SCDF: Fire Code 2023, clause 3.2: compartment walls and floors (checked 25 Nov 2026)SCDF states that minor works listed in its schedule do not require plan approval but are lodged by a Qualified Person (Registered Architect or Professional Engineer).
SCDF: Minor addition and alteration works (checked 22 Nov 2026) - Plan drainage and oil interception Usually needed
Work with a licensed plumber on floor drainage, any wash area and oil interception so oily water does not reach the drains.
PUB states that a company generating trade effluent for discharge into the public sewer must apply for PUB’s Written Approval through the GoBusiness Licensing Portal; PUB aims to process it within 30 working days of receiving all documents.
PUB: Trade effluent management (checked 25 Nov 2026)PUB encourages motor workshops to do maintenance in designated or covered areas, use drip pans and clean oil interceptors regularly.
PUB: Trade effluent management (checked 25 Nov 2026)PUB states car-wash water is discharged to the sewer via a gully trap, and the wash area must be sheltered and kerbed.
PUB: Frequently asked questions — used water (PDF) (checked 22 Nov 2026) - Plan and approve a spray booth Applies if Will you do bodywork or spray painting? Yes — bodywork and spray painting
Spray painting needs an enclosed booth with ventilation and filtration, and paint and thinner storage within safe limits. Check fire safety and environmental requirements before ordering.
SCDF’s Fire Code requires spray painting areas to be in 2-hour compartments, except booths with a built-in vapour extraction system complying with NFPA 33; booths must be mechanically ventilated.
SCDF: Fire Code 2023, clause 3.2: compartment walls and floors (checked 25 Nov 2026)GoBusiness lists a licence requirement for storing petroleum or flammable materials above exemption quantities; for a non-factory business the exemption is up to 20 litres of Class I petroleum and up to 200 litres of Class II/III.
GoBusiness Licensing (SCDF): Petroleum or Flammable Materials Storage Licence (checked 22 Nov 2026) - Notify MOM of your factory (workshop) Usually needed
Under workplace safety law, premises that repair articles using mechanical power count as a factory. A workshop with a compressor or hoists is not exempt even with fewer than 10 employees. Use MOM’s self-assessment to confirm whether you need the free one-time notification or registration.
MOM’s definition of a factory covers premises where mechanical power is used in repairing any article for trade or gain; its vehicle repair category excludes only premises doing cleaning, washing, running repairs or minor adjustments.
Ministry of Manpower: What is a factory (checked 25 Nov 2026)MOM exempts a site only if it has fewer than 10 employees and uses no mechanical power, air receiver, or highly flammable or noxious substance; factories must also engage a licensed electrical worker.
Ministry of Manpower: Requirements for factories (notification and registration) (checked 25 Nov 2026)MOM states factory notification has no processing fee, gives immediate acknowledgement and is valid for life; apply on GoBusiness (industry category “Others”). Registration for high-risk factories costs $45 to $2,340.
Ministry of Manpower: Apply for factory notification or registration (checked 25 Nov 2026)
Full step-by-step guide: Car workshop → · Build my opening plan →