Business licence checker: licences and approvals by industry

Choose your industry to see the licences and approvals new businesses in that industry usually need, which agency handles each one, what it costs where the agency publishes a fee, and when it applies.

This is planning information, not legal advice. Requirements depend on your exact activities and premises; confirm with the agency before you act.

Café

  1. Apply for change of use (if the unit is not approved for F&B) Applies if How much renovation does the space need? Major — bare unit or change from non-F&B use

    If the unit is not already approved for restaurant or café use, apply for URA change of use approval (and HDB approval for HDB units). Ideally confirm this before signing.

    GoBusiness lists URA change of use approval at $500 with an estimated 10 working days’ processing; SLA may charge a Land Betterment Charge.
    GoBusiness Licensing (URA): Change of Use Approval — licence directory (checked 22 Nov 2026)

    HDB asks applicants to expect at least 4 weeks after all supporting documents and payment are received.
    HDB: Change of use (HDB shops and offices) (checked 22 Nov 2026)

  2. Design the layout and prepare the licence layout plan Usually needed

    Work with your designer on the kitchen flow, counter and seating. SFA needs a scaled layout plan showing equipment, exhausts, sinks and the refreshment area boundary.

    SFA asks for a scaled layout plan showing equipment, exhausts, sinks and the boundary of the refreshment area.
    Singapore Food Agency (SFA): Application process and fees for licence/permit for food retail (checked 22 Nov 2026)

  3. Apply for the SFA food shop licence Usually needed

    Apply on GoBusiness Licensing with your layout plan. Submit tenancy, change of use (if needed), cleaning programme and pest control contract within SFA’s deadline.

    SFA lists the food shop licence fee at $195, valid for one year.
    Singapore Food Agency (SFA): Application process and fees for licence/permit for food retail (checked 22 Nov 2026)

    SFA states applications are reviewed within 7 working days; the application is closed if documents are not submitted within 2 months.
    Singapore Food Agency (SFA): Application process and fees for licence/permit for food retail (checked 22 Nov 2026)

  4. Get landlord / management approval for fit-out plans Usually needed

    Malls and many landlords must approve drawings, contractors and work hours before works start.

  5. Check fire safety submissions with a Qualified Person Applies if How much renovation does the space need? Moderate — new kitchen line, plumbing, seating / Major — bare unit or change from non-F&B use

    Ask your designer or contractor whether the works need SCDF plan approval or can be lodged as minor works by a Qualified Person.

    SCDF states that minor works listed in its schedule do not require plan approval but are lodged by a Qualified Person (Registered Architect or Professional Engineer).
    SCDF: Minor addition and alteration works (checked 22 Nov 2026)

Full step-by-step guide: Café → · Build my opening plan →

Car detailing studio

  1. Plan bay layout, lighting and chemical storage Usually needed

    Plan bays, lighting for paint inspection, wash bay position, chemical storage, customer waiting area and power points.

  2. Get landlord approval for fit-out Usually needed

    Submit drawings and contractor details for approval before works start.

  3. Plan wash-bay drainage to PUB requirements Applies if Will you wash cars on site? Yes — wash bay on site

    Confirm with a qualified plumber how wash water will reach the sewer (gully trap, sheltered and kerbed wash area) and whether an oil interceptor or other approvals are needed for your unit.

    PUB states car-wash water is discharged to the sewer via a gully trap, and the wash area must be sheltered and kerbed.
    PUB: Frequently asked questions — used water (PDF) (checked 22 Nov 2026)

Full step-by-step guide: Car detailing studio → · Build my opening plan →

Bubble tea or dessert kiosk

  1. Design the kiosk and prepare the layout plan Usually needed

    Plan a workflow from order to hand-off: POS, preparation, sealer, pick-up. The layout plan goes with your SFA licence application.

    SFA asks for a scaled layout plan showing equipment, exhausts, sinks and the boundary of the refreshment area.
    Singapore Food Agency (SFA): Application process and fees for licence/permit for food retail (checked 22 Nov 2026)

  2. Apply for the SFA food shop licence Usually needed

    A standalone kiosk or takeaway cart is licensed as a Food Shop. Apply on GoBusiness with your layout plan and tenancy documents.

    SFA states that an independent or standalone takeaway kiosk or snack counter qualifies as a Food Shop, and lists standalone kiosks and takeaway food carts as Food Shops.
    Singapore Food Agency (SFA): Requirements for licence/permit for food retail (checked 22 Nov 2026)

    SFA lists the Food Shop licence at $195 a year; Food Stall licences ($32 a year) are for stalls inside a food court or coffee shop.
    Singapore Food Agency (SFA): Businesses that need a licence/permit for food retail (checked 22 Nov 2026)

    SFA states applications are reviewed within 7 working days; the application is closed if documents are not submitted within 2 months.
    Singapore Food Agency (SFA): Application process and fees for licence/permit for food retail (checked 22 Nov 2026)

  3. Get mall approval for kiosk drawings Usually needed

    Malls usually approve kiosk design, materials, signage and contractors before fabrication.

Full step-by-step guide: Bubble tea or dessert kiosk → · Build my opening plan →

Hair or beauty salon

  1. Design stations, basins and treatment rooms Usually needed

    Plan client flow from reception to stations, basins, rooms, retail display and storage.

  2. Get landlord approval for fit-out Usually needed

    Submit drawings and contractor details before works start.

  3. Check fire safety submissions with a Qualified Person Applies if How much renovation does the unit need? Moderate — new stations, basins, plumbing / Major — bare unit, rooms and plumbing

    Ask your contractor whether works need SCDF plan approval or can be lodged as minor works.

    SCDF states that minor works listed in its schedule do not require plan approval but are lodged by a Qualified Person (Registered Architect or Professional Engineer).
    SCDF: Minor addition and alteration works (checked 22 Nov 2026)

  4. Apply for a massage establishment licence Applies if Will any treatment include massage (for example facials or body treatments with massage)? Yes

    Treatments that rub, knead or manipulate the body need a Police massage establishment licence. Treatments without any massage, such as manicures, pedicures and light treatments, do not.

    SPF defines massage as rubbing, kneading or manipulating the human body to relax muscle tension; manicure, pedicure, light, electric and vapour treatments and baths without any massage do not need a licence.
    Singapore Police Force: Apply for a massage establishment licence (checked 22 Nov 2026)

    SPF lists Category 1 and 2 licences at $290 for one year, $50 per employee approval, and processing of approximately 4 weeks; URA or HDB planning approval is required.
    Singapore Police Force: Apply for a massage establishment licence (checked 22 Nov 2026)

    SPF states that from 1 Dec 2026 open-concept massage establishments are no longer exempt and need a new Category 3 licence ($340 for 3 years or $510 for 5 years).
    Singapore Police Force: Apply for a massage establishment licence (checked 22 Nov 2026)

  5. Check rules for lasers and energy-based devices Applies if Will you use lasers, IPL or other energy-based devices? Yes

    Before buying any device, check whether it is controlled by NEA and whether only a doctor may use it. Medical aesthetic procedures belong in clinics.

    NEA states only registered medical practitioners may operate class 4 high-power lasers and HIFU apparatus on humans, at premises approved by MOH; suppliers should not supply these to beauticians.
    NEA: Advisory on non-ionising irradiating apparatus in the beauty and aesthetic industry (checked 22 Nov 2026)

    NEA states class 4 lasers cannot be used in beauty salons; class 3b lasers need N2 (possession) and N3 (user) licences; IPL is not currently a controlled apparatus.
    NEA: Frequently asked questions on lasers (checked 22 Nov 2026)

Full step-by-step guide: Hair or beauty salon → · Build my opening plan →

Car workshop

  1. Plan bays, hoists, parts store and waste store Usually needed

    Lay out work bays and hoists, compressor and air lines, parts storage, a separate area for waste oil and used parts, and customer reception.

  2. Get landlord approval for fit-out Usually needed

    Submit drawings, hoist foundation details and contractor information before works start.

  3. Check fire safety submissions with a Qualified Person Usually needed

    Ask your contractor whether works need SCDF plan approval or can be lodged as minor works, especially if you add a spray booth.

    SCDF’s Fire Code requires a motor vehicle workshop to be separated from other parts of the same building by compartment walls and floors with at least a 2-hour fire resistance rating (4 hours in a basement).
    SCDF: Fire Code 2023, clause 3.2: compartment walls and floors (checked 25 Nov 2026)

    SCDF states that minor works listed in its schedule do not require plan approval but are lodged by a Qualified Person (Registered Architect or Professional Engineer).
    SCDF: Minor addition and alteration works (checked 22 Nov 2026)

  4. Plan drainage and oil interception Usually needed

    Work with a licensed plumber on floor drainage, any wash area and oil interception so oily water does not reach the drains.

    PUB states that a company generating trade effluent for discharge into the public sewer must apply for PUB’s Written Approval through the GoBusiness Licensing Portal; PUB aims to process it within 30 working days of receiving all documents.
    PUB: Trade effluent management (checked 25 Nov 2026)

    PUB encourages motor workshops to do maintenance in designated or covered areas, use drip pans and clean oil interceptors regularly.
    PUB: Trade effluent management (checked 25 Nov 2026)

    PUB states car-wash water is discharged to the sewer via a gully trap, and the wash area must be sheltered and kerbed.
    PUB: Frequently asked questions — used water (PDF) (checked 22 Nov 2026)

  5. Plan and approve a spray booth Applies if Will you do bodywork or spray painting? Yes — bodywork and spray painting

    Spray painting needs an enclosed booth with ventilation and filtration, and paint and thinner storage within safe limits. Check fire safety and environmental requirements before ordering.

    SCDF’s Fire Code requires spray painting areas to be in 2-hour compartments, except booths with a built-in vapour extraction system complying with NFPA 33; booths must be mechanically ventilated.
    SCDF: Fire Code 2023, clause 3.2: compartment walls and floors (checked 25 Nov 2026)

    GoBusiness lists a licence requirement for storing petroleum or flammable materials above exemption quantities; for a non-factory business the exemption is up to 20 litres of Class I petroleum and up to 200 litres of Class II/III.
    GoBusiness Licensing (SCDF): Petroleum or Flammable Materials Storage Licence (checked 22 Nov 2026)

  6. Notify MOM of your factory (workshop) Usually needed

    Under workplace safety law, premises that repair articles using mechanical power count as a factory. A workshop with a compressor or hoists is not exempt even with fewer than 10 employees. Use MOM’s self-assessment to confirm whether you need the free one-time notification or registration.

    MOM’s definition of a factory covers premises where mechanical power is used in repairing any article for trade or gain; its vehicle repair category excludes only premises doing cleaning, washing, running repairs or minor adjustments.
    Ministry of Manpower: What is a factory (checked 25 Nov 2026)

    MOM exempts a site only if it has fewer than 10 employees and uses no mechanical power, air receiver, or highly flammable or noxious substance; factories must also engage a licensed electrical worker.
    Ministry of Manpower: Requirements for factories (notification and registration) (checked 25 Nov 2026)

    MOM states factory notification has no processing fee, gives immediate acknowledgement and is valid for life; apply on GoBusiness (industry category “Others”). Registration for high-risk factories costs $45 to $2,340.
    Ministry of Manpower: Apply for factory notification or registration (checked 25 Nov 2026)

Full step-by-step guide: Car workshop → · Build my opening plan →

AI vending machine business

  1. Get approval for machines in public or HDB areas Applies if Where will the machines be placed? Public areas (HDB estates, state land) / Both

    Common areas in HDB estates are managed by the Town Council, and state land by SLA. Ask the managing authority for permission and its charges before you install.

    Under the Town Councils (Chargeable Uses) Rules 2025, Town Councils may set charges for vending machines, including machines placed in a void deck by someone other than a shop owner or tenant, limited to 3 square metres where the void deck has no shop, stall or kiosk.
    Singapore Statutes Online: Town Councils (Chargeable Uses) Rules 2025 (checked 25 Nov 2026)

    Example: Tanjong Pagar Town Council’s 2024 rate sheet lists vending machines at $141.70 per unit per month (GST inclusive). Charges vary by Town Council.
    Tanjong Pagar Town Council: Temporary Occupation Licence rates 2024 (PDF) (checked 25 Nov 2026)

  2. Confirm your food is exempt from SFA licensing Applies if What will your machines sell? Packaged snacks and bottled or canned drinks / Pre-packed chilled or frozen food (salads, meals, ice cream)

    Pre-packed food from SFA-licensed suppliers does not need a vending licence, but you still have display and temperature duties. Keep proof that each supplier is SFA-licensed.

    SFA states a licence is only required for vending machines that pose a higher food safety risk: those doing in-machine food preparation (such as adding toppings, cutting, grinding, juicing, mixing, heating or cooking) or serving raw meat or seafood.
    Singapore Food Agency (SFA): Requirements for licence/permit for food retail (checked 22 Nov 2026)

    SFA lists as exempt: packaged snacks, canned, packed or bottled drinks, packaged bread, and pre-packed cooked meals, ice cream and chilled foods (such as cut fruit, salads and milk) from SFA-licensed sources without in-machine preparation.
    Singapore Food Agency (SFA): Requirements for licence/permit for food retail (checked 22 Nov 2026)

    SFA states dairy products must be stored below 7°C, and vending machines should display the accurate temperature and the operator’s contact details.
    Singapore Food Agency (SFA): Purchasing food from vending machines (checked 25 Nov 2026)

  3. Apply for an SFA Food Shop Licence for your machines Applies if What will your machines sell? Food prepared in the machine (fresh coffee, heating, juicing)

    Machines that prepare food need an SFA Food Shop Licence. Machines must meet SFA conditions on temperature display, automatic shut-down, labelling and records.

    GoBusiness lists food vending machines under the SFA Food Shop Licence, costing $195 and valid for one year, with an estimated processing time of 7 working days if the application is complete.
    GoBusiness Licensing (SFA): Food Shop Licence — licence directory (checked 25 Nov 2026)

    SFA’s conditions require a thermometer readable from outside, an automatic shut-down that stops dispensing if storage conditions fail (including power failure), the operator’s name, contact and licence number on the machine, and current records for each machine covering the past 30 days.
    Singapore Food Agency (SFA): Licence conditions for food vending machines (PDF) (checked 25 Nov 2026)

    SFA’s conditions require frozen meat and seafood at −12°C or below, chilled food below 5°C and hot food at no less than 60°C, and the licensee must notify SFA of the machine locations.
    Singapore Food Agency (SFA): Licence conditions for food vending machines (PDF) (checked 25 Nov 2026)

  4. Set up personal data protection for cameras Applies if Will machines use cameras (AI recognition or security)? Yes

    If machines capture images of people, tell customers clearly (signs), limit what you collect and keep, secure the data, and appoint someone responsible for data protection.

Full step-by-step guide: AI vending machine business → · Build my opening plan →

Facial and beauty shop

  1. Design treatment rooms, sinks and sterilisation area Usually needed

    Plan reception, consultation area, treatment rooms or beds, a sink in or near each room, a separate area to clean and sterilise tools, and product storage.

  2. Get landlord approval for fit-out Usually needed

    Submit drawings and contractor details before works start.

  3. Check fire safety submissions with a Qualified Person Applies if How much renovation does the unit need? Moderate — new treatment rooms and plumbing / Major — bare unit

    Ask your contractor whether works need SCDF plan approval or can be lodged as minor works.

    SCDF states that minor works listed in its schedule do not require plan approval but are lodged by a Qualified Person (Registered Architect or Professional Engineer).
    SCDF: Minor addition and alteration works (checked 22 Nov 2026)

  4. Apply for a massage establishment licence Applies if Will any treatment include massage (for example facial or shoulder massage)? Yes

    Facials or treatments that rub, knead or manipulate the body need a Police massage establishment licence, and each therapist who gives massage needs approval. Treatments with no massage at all, such as manicures and light treatments, do not.

    SPF defines massage as rubbing, kneading or manipulating the human body to relax muscle tension; manicure, pedicure, light, electric and vapour treatments and baths without any massage do not need a licence.
    Singapore Police Force: Apply for a massage establishment licence (checked 22 Nov 2026)

    SPF lists Category 1 and 2 licences at $290 for one year, $50 per employee approval, and processing of approximately 4 weeks; URA or HDB planning approval is required.
    Singapore Police Force: Apply for a massage establishment licence (checked 22 Nov 2026)

    SPF states that from 1 Dec 2026 open-concept massage establishments are no longer exempt and need a new Category 3 licence ($340 for 3 years or $510 for 5 years).
    Singapore Police Force: Apply for a massage establishment licence (checked 22 Nov 2026)

  5. Check rules before buying lasers or energy-based devices Applies if Will you use lasers, HIFU, IPL or other energy-based devices? Yes

    Some devices are controlled by NEA and some may only be used by doctors in clinics. Check before you buy or advertise any treatment.

    NEA states only registered medical practitioners may operate class 4 high-power lasers and HIFU apparatus on humans, at premises approved by MOH; suppliers should not supply these to beauticians.
    NEA: Advisory on non-ionising irradiating apparatus in the beauty and aesthetic industry (checked 22 Nov 2026)

    NEA states class 4 lasers cannot be used in beauty salons; class 3b lasers need N2 (possession) and N3 (user) licences; IPL is not currently a controlled apparatus.
    NEA: Frequently asked questions on lasers (checked 22 Nov 2026)

Full step-by-step guide: Facial and beauty shop → · Build my opening plan →

Convenience store or minimart

  1. Get HDB approval for your trade Applies if What kind of premises? HDB shop

    Apply through GoBusiness to change or confirm the trade of an HDB rental shop. Licence applications ask for this approval.

    HDB approves a change to a trade on its permissible list in 1 day; the admin fee is $109 (incl. GST) for the balance of the term, or $218 for a fresh term.
    HDB: Change of trade (HDB shops) (checked 25 Nov 2026)

  2. Apply for the SFA supermarket licence Applies if What food will you sell? Also packed raw meat or seafood / Also food prepared on site (hot food, rotisserie)

    Needed if you sell raw meat or seafood, or prepare food. Submit your layout plan, tenancy, URA or HDB approval, cleaning programme and pest-control contract, then book a virtual inspection.

    SFA lists the supermarket licence at $250 a year for under 200 m² and $500 a year for over 200 m²; the food shop licence is $195 a year.
    Singapore Food Agency (SFA): Businesses that need a licence/permit for food retail (checked 22 Nov 2026)

    SFA reviews a complete application within 7 working days and confirms the layout within another 7 working days; missing documents must be sent within 2 months, and the virtual inspection must be booked at least 5 working days ahead.
    Singapore Food Agency (SFA): Application process and fees for licence/permit for food retail (checked 22 Nov 2026)

  3. Apply for the HSA tobacco retail licence Applies if Will you sell cigarettes or tobacco? Yes

    One licence per outlet, not transferable. You need at least one year of tenancy from the application date.

    HSA charges $400 for a new tobacco retail licence (including a $60 non-refundable application fee) and $300 a year to renew; it is valid for 12 months and processed in 14 working days.
    Health Sciences Authority (HSA): Fees and turnaround time of tobacco licences (checked 25 Nov 2026)

    HSA requires a separate licence for each outlet, a tenancy of at least 1 year from the application date, only employees handling tobacco, and invoices or receipts kept for 1 year.
    Health Sciences Authority (HSA): Apply for a tobacco retail licence (checked 25 Nov 2026)

  4. Apply for the Police liquor licence Applies if Will you sell beer or liquor? Beer, wine and spirits / Beer only

    Apply on GoBusiness for Class 3A (all liquor) or Class 3B (beer only) for sale to take away. Upload URA planning permission or an HDB letter, and your ACRA profile.

    SPF lists Class 3A (retail liquor for consumption off the premises) and Class 3B (beer only) at $110 a year each, with sale hours of 7am to 10.30pm.
    Singapore Police Force: Types of liquor licences and fees (checked 22 Nov 2026)

    GoBusiness states liquor licences take about 3 weeks to process and are valid for 1 year; supplying liquor without a licence can lead to a fine of up to $20,000.
    GoBusiness Licensing: Liquor licence (Class 1A, 1B, 2A, 2B, 3A, 3B, 4) (checked 25 Nov 2026)

Full step-by-step guide: Convenience store or minimart → · Build my opening plan →

Tuition or enrichment centre

  1. Get URA or HDB approval for a tuition centre Usually needed

    MOE needs a URA Grant of Written Permission or HDB approval on the use of the premises.

    HDB processes a change of use in at least 4 weeks after all documents and payment are received; tenants of HDB rental shops apply through GoBusiness.
    HDB: Change of use: application process (checked 25 Nov 2026)

    URA’s change of use fee is $500 (non-refundable) and assessment generally takes 10 working days; URA advises not to commit to a tenancy or renovation before its decision.
    URA: Changing the use of your property (checked 25 Nov 2026)

  2. SCDF fire safety plan approval Usually needed

    A Qualified Person (registered architect or engineer) submits plans for the change of use. MOE asks for an SCDF-approved floor plan described as a tuition or enrichment centre.

    SCDF requires plan approval before fire safety works or a change of use affecting fire safety, submitted by a Qualified Person; the fee is $90 per storey for a change of use with no added floor area.
    Singapore Civil Defence Force (SCDF): Plan approval (checked 25 Nov 2026)

  3. Get the SCDF Fire Safety Certificate Usually needed

    After works are done, a Registered Inspector checks them and your Qualified Person applies for the Fire Safety Certificate. You need it before occupying the premises.

    SCDF requires a Fire Safety Certificate before the premises are occupied; there is no fee and SCDF responds within 3 working days.
    Singapore Civil Defence Force (SCDF): Fire Safety Certificate and Temporary Fire Permit (checked 25 Nov 2026)

  4. Register the centre, courses and teachers with MOE Usually needed

    Apply on GoBusiness once renovation is finished. MOE inspects the premises. Do not start teaching until the certificate is issued and displayed. If you teach only enrichment such as art or music, confirm with MOE whether you must register.

    The MOE registration fee is $392.52 before GST, non-refundable, and the certificate does not expire; the management committee must be re-registered every 3 years.
    GoBusiness Licensing: Certificate of Registration of School (checked 25 Nov 2026)

    MOE processes applications in about 14 days, counted from a complete set of documents or the premises passing MOE’s site inspection, whichever is later.
    Ministry of Education (MOE): Register a private school: documents required (checked 25 Nov 2026)

    Under the Education Act, managing or teaching in an unregistered school can lead to a fine of up to $2,000, imprisonment of up to 1 year, or both.
    Singapore Statutes Online: Education Act 1957 (checked 25 Nov 2026)

    Teachers or courses added after registration need an MOE amendment, processed in about 14 days, and MOE issues a letter permitting each teacher to teach.
    Ministry of Education (MOE): Private education: add new courses and teachers (checked 25 Nov 2026)

Full step-by-step guide: Tuition or enrichment centre → · Build my opening plan →

Childcare centre or preschool

  1. Get approved use for the site Usually needed

    Confirm the approved use with URA or HDB. Landed houses need a URA change of use; HDB sites need HDB approval.

    URA’s change of use fee is $500 (non-refundable) and assessment generally takes 10 working days.
    URA: Changing the use of your property (checked 25 Nov 2026)

  2. SCDF fire safety and building approvals Usually needed

    Your Qualified Person prepares plans titled for an early childhood development centre and obtains the SCDF approvals and the Fire Safety Certificate. ECDA also needs the building’s TOP or CSC.

    ECDA requires an SCDF Fire Safety Certificate on a floor plan certified by a Qualified Person and titled for an ECDC; plans approved for commercial schools are not accepted.
    Early Childhood Development Agency (ECDA): Guide to setting up an Early Childhood Development Centre (PDF) (checked 25 Nov 2026)

    SCDF requires plan approval before fire safety works or a change of use affecting fire safety, submitted by a Qualified Person.
    Singapore Civil Defence Force (SCDF): Plan approval (checked 25 Nov 2026)

  3. Apply for the ECDA licence Usually needed

    Apply on GoBusiness with your premises approvals and staff. A Licensing Officer visits the centre. You must not advertise, operate or collect money before the licence is issued.

    ECDA states a preschool must not advertise, start operating or collect any money before it holds a valid licence; new applications are processed in 14 working days after complete documents and the site visit, whichever is later.
    Early Childhood Development Agency (ECDA): Setting up an ECDC (checked 25 Nov 2026)

    ECDA charges a $500 application and licence fee on GoBusiness, then a Licensing Officer conducts an on-site visit.
    Early Childhood Development Agency (ECDA): Guide to setting up an Early Childhood Development Centre (PDF) (checked 25 Nov 2026)

    ECDA issues licences for 6, 12, 24 or 36 months depending on the centre’s quality and compliance.
    Early Childhood Development Agency (ECDA): Choosing a preschool for your child (checked 25 Nov 2026)

    Operating a preschool without a licence can lead to a fine of up to $10,000, imprisonment of up to 12 months, or both.
    Singapore Statutes Online: Early Childhood Development Centres Act 2017, section 6 (checked 25 Nov 2026)

Full step-by-step guide: Childcare centre or preschool → · Build my opening plan →

Self-service laundromat

  1. Get URA or HDB approval for a laundromat Usually needed

    HDB shops apply to HDB; commercial buildings apply to URA (check instant lodgment first); eligible shophouses can lodge for instant approval.

    HDB processes a change of use in at least 4 weeks after all documents and payment are received; tenants of HDB rental shops apply through GoBusiness.
    HDB: Change of use: application process (checked 25 Nov 2026)

    URA’s change of use fee is $500 (non-refundable) and assessment generally takes 10 working days; URA advises not to commit to a tenancy or renovation before its decision.
    URA: Changing the use of your property (checked 25 Nov 2026)

  2. Check PUB rules for discharging washing water Usually needed

    Ask PUB whether your laundromat needs written approval to discharge used water to the sewer. If it does, apply early — it takes 4–6 weeks.

    PUB requires trade premises that discharge trade effluent into the public sewer to obtain its written approval first; discharging without it is an offence.
    PUB: Trade effluent management (checked 25 Nov 2026)

    PUB’s written approval has no application fee, takes 4–6 weeks (30 working days) after a complete submission, and is valid for 5 years; monthly fees apply if effluent exceeds the limits.
    GoBusiness Licensing: Written approval for the discharge of trade effluent into the public sewer (checked 25 Nov 2026)

  3. Plan electrical works with a licensed electrical worker Usually needed

    Dryers and washers draw heavy loads. A licensed electrical worker designs and certifies the installation, and larger loads need an EMA installation licence.

    EMA requires electrical works at consumers’ premises to be done by Licensed Electrical Workers, who inspect and certify the installation before supply is turned on.
    Energy Market Authority (EMA): Electrical safety (checked 25 Nov 2026)

    EMA requires an electrical installation licence for non-domestic installations with an approved load above 45 kVA.
    Energy Market Authority (EMA): Electrical installation licence (checked 25 Nov 2026)

  4. Check whether SCDF plans are needed Usually needed

    Ask a Qualified Person whether your change of use or works affect fire safety and need SCDF approval.

    SCDF requires plan approval before fire safety works or a change of use affecting fire safety, submitted by a Qualified Person; works under the Fire Safety (Exemption) Order need no submission.
    Singapore Civil Defence Force (SCDF): Plan approval (checked 25 Nov 2026)

Full step-by-step guide: Self-service laundromat → · Build my opening plan →

Student care centre

  1. Get URA or HDB approval for the premises Usually needed

    HDB shops need HDB’s prior approval; landed houses need a URA change of use; most commercial buildings need no planning permission.

    HDB processes a change of use in at least 4 weeks after all documents and payment are received; tenants of HDB rental shops apply through GoBusiness.
    HDB: Change of use: application process (checked 25 Nov 2026)

    URA’s change of use fee is $500 (non-refundable) and assessment generally takes 10 working days.
    URA: Changing the use of your property (checked 25 Nov 2026)

  2. SCDF fire safety plans and certificate Usually needed

    Converting a unit to student care changes fire safety requirements. A Qualified Person submits plans; you need a Fire Safety Certificate (or temporary fire permit) before occupying.

    SCDF requires plan approval before fire safety works or a change of use affecting fire safety, submitted by a Qualified Person; the fee is $90 per storey for a change of use with no added floor area.
    Singapore Civil Defence Force (SCDF): Plan approval (checked 25 Nov 2026)

    SCDF requires a Fire Safety Certificate before the premises are occupied; there is no fee and SCDF responds within 3 working days.
    Singapore Civil Defence Force (SCDF): Fire Safety Certificate and Temporary Fire Permit (checked 25 Nov 2026)

    MSF’s SCFA terms require HDB or URA approval for the premises and an SCDF Fire Safety Certificate or Temporary Fire Permit.
    Ministry of Social and Family Development (MSF): Terms and conditions for student care centres appointed as SCFA administrators (PDF, Nov 2025) (checked 25 Nov 2026)

  3. Register with MSF as an SCFA administrator Applies if Will you register with MSF to accept SCFA subsidies? Yes — register as an SCFA administrator

    Submit MSF’s online form with your GIRO form, Declaration of Offences and ACRA profile. Registered centres must meet MSF’s minimum standards and are audited.

    MSF registers SCFA administrators through an online form with an Interbank GIRO form, a Declaration of Offences form and the ACRA Bizfile profile; registered centres must meet minimum requirements on environment, health, safety, supervision and programming, and are audited.
    Ministry of Social and Family Development (MSF): Register as an SCFA administrator (checked 25 Nov 2026)

    MSF’s SCFA terms require at least 10% of enrolled students to be on SCFA, the same fee for all students in the same programme and school year, and fee changes submitted by 30 September of the year before.
    Ministry of Social and Family Development (MSF): Terms and conditions for student care centres appointed as SCFA administrators (PDF, Nov 2025) (checked 25 Nov 2026)

    MSF’s SCFA terms require 6-monthly reports, serious incidents reported within 12 hours, and records kept for 3 years; MSF can stop subsidies or revoke administrator status for non-compliance.
    Ministry of Social and Family Development (MSF): Terms and conditions for student care centres appointed as SCFA administrators (PDF, Nov 2025) (checked 25 Nov 2026)

Full step-by-step guide: Student care centre → · Build my opening plan →