Open a café in Singapore

Café startup cost calculator for Singapore

Last reviewed: 22 Nov 2026 · Editorial standards

Enter your budget, then adjust each line. Every line starts as a labelled planning estimate; change it to your own figure, or mark it as a confirmed quote once a supplier has quoted in writing. The total needed includes contingency on upfront costs and a reserve of monthly costs to carry you through the first months of trade.

Build my opening plan

Budget calculator

Loading calculator…

How the estimates work

  • Each line defaults to the midpoint of our planning range, rounded to the nearest S$100.
  • The deposit is calculated as three months’ rent and updates when you change the rent.
  • Contingency is a percentage of upfront costs; the operating reserve is monthly costs × the number of months.
  • Estimates are not quotes. Confirmed quotes are labelled separately.

Planning estimates by OpenReady SG, last reviewed 22 Nov 2026. They are not quotes or published prices — replace them with your own quotes.