Open a hair or beauty salon in Singapore
How to open a hair or beauty salon in Singapore
Last reviewed: 22 Nov 2026 · Editorial standards
A hair salon needs no specific licence in Singapore, but the premises must suit the use and some beauty services bring extra rules. Massage needs a Police licence, some lasers and HIFU may only be used by doctors, and prepaid packages must be sold fairly. This guide sets out every step in order, with official sources for each rule.
Decide and register
-
1Define your services, prices and customers
Set your service menu with time per service and price. This decides how many stations, basins or rooms you need.
Gather
- Service menu with duration and price
- Target clients and peak days
- Competitor prices nearby
-
2Set your budget, funding and break-even
Use the budget tool to separate fit-out and equipment from rent, wages and products.
Gather
- Funding available
- Break-even clients per week
-
3Register your business with ACRA
Register through Bizfile before signing a lease or applying for any licence.
Gather
- Business name options
- Owner details
- Business address
- SSIC activity description
ACRA lists a one-year sole proprietorship registration at $115 ($15 name application plus $100 registration).
ACRA: Choosing a business structure (checked 22 Nov 2026)Not a Singapore Citizen or PR? Starting a business as a foreigner →
-
4Open a business bank account and bookkeeping
Keep package prepayments and daily takings in a business account and track unused package balances.
-
5Check whether you must register for GST
Compare your revenue forecast with the IRAS threshold. Package prepayments count when received.
Premises
-
6Shortlist premises and check approved use
Salons are a Shop (Services) use. Check the unit’s approved use, or HDB’s permitted trades for HDB shops.
Gather
- Address and floor plan
- Rent and lease term
- Previous tenant’s trade
Confirm with
Landlord / agent
- Approved use of the unit
- Water supply and drainage for basins
- Hot water and power capacity
URA
- Approved use via the approved-use enquiry
URA lists barber shops, beauty salons and hairdressing salons as Shop (Services) use.
URA: Other shop examples (change of use) (checked 22 Nov 2026)HDB’s permissible trades for its shops include barber shops, beauty salons and hairdressing salons.
HDB: Permissible trades for HDB shops (checked 22 Nov 2026)URA’s approved-use enquiry costs $54.50 (incl. GST) per enquiry; replies are instant if the record is online, otherwise about 10 working days.
URA: Enquiry on approved use of premises — FAQ (checked 22 Nov 2026) -
7Check plumbing, power and ventilation before signing
Hair basins need hot water and drainage; dryers and steamers need power; colour and nail chemicals need ventilation.
Confirm with
Landlord
- Water heater capacity
- Drain points for basins
- Electrical load
- Ventilation and fume rules
- Reinstatement at lease end
-
8Negotiate and sign the lease
Negotiate a fit-out period. If you will offer massage, the licence needs URA or HDB planning approval for the premises, so check this first.
Confirm with
Landlord
- Rent-free fit-out period
- Deposit
- Signage rights
- Permission for treatment rooms
Design and approvals
-
9Design stations, basins and treatment rooms
Plan client flow from reception to stations, basins, rooms, retail display and storage.
Gather
- Equipment list with sizes and power
-
10Get landlord approval for fit-out
Submit drawings and contractor details before works start.
-
11Check fire safety submissions with a Qualified Person
Applies if How much renovation does the unit need? Moderate — new stations, basins, plumbing / Major — bare unit, rooms and plumbing
Ask your contractor whether works need SCDF plan approval or can be lodged as minor works.
SCDF states that minor works listed in its schedule do not require plan approval but are lodged by a Qualified Person (Registered Architect or Professional Engineer).
SCDF: Minor addition and alteration works (checked 22 Nov 2026) -
12Apply for a massage establishment licence
Applies if Will any treatment include massage (for example facials or body treatments with massage)? Yes
Treatments that rub, knead or manipulate the body need a Police massage establishment licence. Treatments without any massage, such as manicures, pedicures and light treatments, do not.
Gather
- URA or HDB planning approval for the premises
- Floor plan
- Details of each employee who will provide massage
Confirm with
Singapore Police Force
- Which licence category fits your premises
- Approval for each employee
SPF defines massage as rubbing, kneading or manipulating the human body to relax muscle tension; manicure, pedicure, light, electric and vapour treatments and baths without any massage do not need a licence.
Singapore Police Force: Apply for a massage establishment licence (checked 22 Nov 2026)SPF lists Category 1 and 2 licences at $290 for one year, $50 per employee approval, and processing of approximately 4 weeks; URA or HDB planning approval is required.
Singapore Police Force: Apply for a massage establishment licence (checked 22 Nov 2026)SPF states that from 1 Dec 2026 open-concept massage establishments are no longer exempt and need a new Category 3 licence ($340 for 3 years or $510 for 5 years).
Singapore Police Force: Apply for a massage establishment licence (checked 22 Nov 2026) -
13Check rules for lasers and energy-based devices
Applies if Will you use lasers, IPL or other energy-based devices? Yes
Before buying any device, check whether it is controlled by NEA and whether only a doctor may use it. Medical aesthetic procedures belong in clinics.
Confirm with
Device supplier
- Laser class or device type
- Whether NEA licences are needed to possess or use it
NEA
- Licence requirements for the device
NEA states only registered medical practitioners may operate class 4 high-power lasers and HIFU apparatus on humans, at premises approved by MOH; suppliers should not supply these to beauticians.
NEA: Advisory on non-ionising irradiating apparatus in the beauty and aesthetic industry (checked 22 Nov 2026)NEA states class 4 lasers cannot be used in beauty salons; class 3b lasers need N2 (possession) and N3 (user) licences; IPL is not currently a controlled apparatus.
NEA: Frequently asked questions on lasers (checked 22 Nov 2026)
Fit-out
-
14Renovation and fit-out
Plumbing for basins, electrical points, flooring, mirrors, rooms, reception and retail display.
Confirm with
Contractor
- Completion date
- Defects period
- Who handles authority submissions
-
15Set up utilities, internet and laundry
Utilities, internet for bookings, towel laundry and waste collection.
-
16Shopfront signage
Design signage and check landlord rules. Larger signs may need a BCA licence.
BCA exempts signboards totalling not more than 5m²; licence applications take about 7 working days, plus two weeks if URA must evaluate.
BCA: Outdoor advertising sign / signboard licence application (checked 22 Nov 2026)
Equipment, products and systems
-
17Order salon equipment and furniture
Styling chairs, basins, dryers, trolleys, steamers, treatment beds and sterilisation equipment.
Confirm with
Equipment supplier
- Lead time
- Installation of basins
- Warranty and servicing
-
18Choose professional and retail products
Open accounts for professional products and retail stock. If you plan to sell your own-brand cosmetics, check HSA’s notification rules first.
Confirm with
Product supplier
- Trade pricing and minimum order
- Training on colour or treatment ranges
- Whether retail products are notified with HSA
HSA states a cosmetic product notification usually needs to be submitted before the product can be sold, and re-notification is required after one year.
Health Sciences Authority (HSA): Cosmetic products — overview (checked 22 Nov 2026) -
19Set up bookings, POS and payments
Online booking with reminders, client records, package balances and card and PayNow payments.
Confirm with
Software supplier
- Package and membership tracking
- Staff commission reports
- Monthly fee and payment rates
People and compliance
-
20Recruit stylists and therapists
Applies if Will you hire staff before opening? Yes
Recruit staff, agree commission structures, and set up CPF. Check work pass rules before hiring foreign staff.
-
21Set hygiene and sterilisation routines
Write cleaning, disinfection and sterilisation steps for tools and stations, and train every staff member on them.
HealthHub publishes guidance for barbers, hairdressers and beauticians on preventing blood-borne infections.
HealthHub: Guidance for barbers, hairdressers and beauticians (checked 22 Nov 2026) -
22Write fair terms for prepaid packages
Applies if Will you sell prepaid packages? Yes
Show prices clearly before treatment, avoid pressure selling, and set out refund and expiry terms in writing. Consider voluntary CaseTrust accreditation.
CCS states beauty businesses must give clear and accurate information on prices before treatment, must not pressure customers, and must not make unsubstantiated claims.
Competition and Consumer Commission of Singapore (CCS): Fair trading practices for the beauty industry (checked 22 Nov 2026)CASE (not a government body) runs voluntary CaseTrust accreditation for spa and wellness businesses, which requires a 5-working-day cooling-off period and prepayment protection.
CASE (non-government): CaseTrust accreditation for spa and wellness businesses (checked 22 Nov 2026) -
23Arrange insurance
Public and treatment liability, contents cover, and work injury compensation for employees.
Confirm with
Insurer / broker
- Cover for treatment injuries and allergic reactions
- Cover for products sold
Which insurance is required, and what to consider for your sector →
Launch
-
24Website, bookings and pre-opening marketing
Set up a simple website with your services or menu, prices, hours, location and booking or ordering links, so customers can find you on Google. Google Business Profile, social channels with portfolio photos, and opening offers. Open online bookings before launch.
-
25Install and test equipment
Test hot water at all basins at once, dryers on every circuit, and the booking flow end to end.
-
26Staff training and trial services
Run services on friends to time each one and check consultation and aftercare scripts.
-
27Soft launch
Take limited bookings to test flow before the full launch.
-
28Opening day
First day of trade.
Costs to budget for
| Upfront | Planning range |
|---|---|
| Security deposit (assumed 3 months’ rent) | S$12,000 – S$36,000 |
| Renovation and fit-out | S$35,000 – S$80,000 |
| Salon equipment and furniture | S$15,000 – S$40,000 |
| Design and professional fees | S$3,000 – S$10,000 |
| Opening professional and retail stock | S$3,000 – S$10,000 |
| Booking, POS and tablet set-up | S$500 – S$2,500 |
| Registration and enquiry fees | S$300 – S$1,500 |
| Package terms, accreditation and prepayment protection | S$1,000 – S$4,000 |
| Signage, branding and launch marketing | S$3,000 – S$10,000 |
| Recruitment and pre-opening wages | S$2,000 – S$6,000 |
| Insurance (first-year premium) | S$1,500 – S$4,000 |
| Monthly | Planning range |
| Rent (incl. service charge) | S$4,000 – S$12,000 |
| Staff salaries and commissions incl. employer CPF | S$10,000 – S$30,000 |
| Professional products | S$1,500 – S$5,000 |
| Utilities and internet | S$800 – S$2,000 |
| Booking and software subscriptions | S$100 – S$400 |
| Marketing | S$800 – S$3,000 |
| Laundry, cleaning and waste | S$300 – S$900 |
| Accounting and bookkeeping | S$300 – S$800 |
Planning estimate Planning estimates by OpenReady SG, last reviewed 22 Nov 2026. They are not quotes or published prices — replace them with your own quotes.
What changes your plan
- What services will you offer?
- Changes equipment, layout and which checks apply.
- Will any treatment include massage (for example facials or body treatments with massage)?
- Massage services need a massage establishment licence from the Police.
- Will you use lasers, IPL or other energy-based devices?
- Some devices are controlled by NEA and some may only be used by doctors.
- Will you sell prepaid packages?
- Adds fair-trading terms for package sales.
- How much renovation does the unit need?
- Changes renovation time, fire-safety checks and cost.
- Will you hire staff before opening?
- Adds recruitment and CPF set-up.
Official sources
- ACRA: Choosing a business structure (checked 22 Nov 2026)
- URA: Other shop examples (change of use) (checked 22 Nov 2026)
- HDB: Permissible trades for HDB shops (checked 22 Nov 2026)
- URA: Enquiry on approved use of premises — FAQ (checked 22 Nov 2026)
- SCDF: Minor addition and alteration works (checked 22 Nov 2026)
- Singapore Police Force: Apply for a massage establishment licence (checked 22 Nov 2026)
- NEA: Advisory on non-ionising irradiating apparatus in the beauty and aesthetic industry (checked 22 Nov 2026)
- NEA: Frequently asked questions on lasers (checked 22 Nov 2026)
- Health Sciences Authority (HSA): Cosmetic products — overview (checked 22 Nov 2026)
- Competition and Consumer Commission of Singapore (CCS): Fair trading practices for the beauty industry (checked 22 Nov 2026)
- CASE (non-government): CaseTrust accreditation for spa and wellness businesses (checked 22 Nov 2026)
- HealthHub: Guidance for barbers, hairdressers and beauticians (checked 22 Nov 2026)
- BCA: Outdoor advertising sign / signboard licence application (checked 22 Nov 2026)