Business licence checker: licences and approvals by industry

Choose your industry to see the licences and approvals new businesses in that industry usually need, which agency handles each one, what it costs where the agency publishes a fee, and when it applies.

This is planning information, not legal advice. Requirements depend on your exact activities and premises; confirm with the agency before you act.

Facial and beauty shop

  1. Design treatment rooms, sinks and sterilisation area Usually needed

    Plan reception, consultation area, treatment rooms or beds, a sink in or near each room, a separate area to clean and sterilise tools, and product storage.

  2. Get landlord approval for fit-out Usually needed

    Submit drawings and contractor details before works start.

  3. Check fire safety submissions with a Qualified Person Applies if How much renovation does the unit need? Moderate — new treatment rooms and plumbing / Major — bare unit

    Ask your contractor whether works need SCDF plan approval or can be lodged as minor works.

    SCDF states that minor works listed in its schedule do not require plan approval but are lodged by a Qualified Person (Registered Architect or Professional Engineer).
    SCDF: Minor addition and alteration works (checked 22 Nov 2026)

  4. Apply for a massage establishment licence Applies if Will any treatment include massage (for example facial or shoulder massage)? Yes

    Facials or treatments that rub, knead or manipulate the body need a Police massage establishment licence, and each therapist who gives massage needs approval. Treatments with no massage at all, such as manicures and light treatments, do not.

    SPF defines massage as rubbing, kneading or manipulating the human body to relax muscle tension; manicure, pedicure, light, electric and vapour treatments and baths without any massage do not need a licence.
    Singapore Police Force: Apply for a massage establishment licence (checked 22 Nov 2026)

    SPF lists Category 1 and 2 licences at $290 for one year, $50 per employee approval, and processing of approximately 4 weeks; URA or HDB planning approval is required.
    Singapore Police Force: Apply for a massage establishment licence (checked 22 Nov 2026)

    SPF states that from 1 Dec 2026 open-concept massage establishments are no longer exempt and need a new Category 3 licence ($340 for 3 years or $510 for 5 years).
    Singapore Police Force: Apply for a massage establishment licence (checked 22 Nov 2026)

  5. Check rules before buying lasers or energy-based devices Applies if Will you use lasers, HIFU, IPL or other energy-based devices? Yes

    Some devices are controlled by NEA and some may only be used by doctors in clinics. Check before you buy or advertise any treatment.

    NEA states only registered medical practitioners may operate class 4 high-power lasers and HIFU apparatus on humans, at premises approved by MOH; suppliers should not supply these to beauticians.
    NEA: Advisory on non-ionising irradiating apparatus in the beauty and aesthetic industry (checked 22 Nov 2026)

    NEA states class 4 lasers cannot be used in beauty salons; class 3b lasers need N2 (possession) and N3 (user) licences; IPL is not currently a controlled apparatus.
    NEA: Frequently asked questions on lasers (checked 22 Nov 2026)

Full step-by-step guide: Facial and beauty shop → · Build my opening plan →