Open a facial and beauty shop in Singapore
How to open a facial and beauty shop in Singapore
Last reviewed: 22 Nov 2026 · Editorial standards
Many facials include massage, and in Singapore massage services need a Police licence, with approval for each therapist and planning approval for the premises. From 1 Dec 2026, open-concept outlets also need a licence. Devices such as class 4 lasers and HIFU are for doctors only. This guide puts every step in order with official sources, so you can plan licences before you sign a lease.
Decide and register
-
1Define your treatment menu, prices and customers
List each treatment with duration, price and whether it involves massage or devices. This decides your licences, rooms and equipment.
Gather
- Treatment menu with duration and price
- Which treatments involve massage or devices
- Target customers and competitor prices
-
2Set your budget, funding and break-even
Use the budget tool to separate fit-out, beds and devices from rent, wages and products.
Gather
- Funding available
- Break-even treatments per week
-
3Register your business with ACRA
Register through Bizfile before signing a lease or applying for licences.
Gather
- Business name options
- Owner details
- Business address
- SSIC activity description
ACRA lists a one-year sole proprietorship registration at $115 ($15 name application plus $100 registration).
ACRA: Choosing a business structure (checked 22 Nov 2026)Not a Singapore Citizen or PR? Starting a business as a foreigner →
-
4Open a business bank account and bookkeeping
Keep package prepayments and daily takings in a business account, and track unused package balances.
-
5Check whether you must register for GST
Compare your revenue forecast with the IRAS threshold. Package prepayments count when received.
GST registration is compulsory if taxable turnover exceeds $1 million at the end of a calendar year, or is expected to in the next 12 months.
IRAS: Do I need to register for GST? (checked 25 Nov 2026)
Premises
-
6Shortlist premises and check approved use
Beauty salons are a Shop (Services) use. If you will offer massage, the Police licence needs URA or HDB planning approval for the premises, so check this before you commit.
Gather
- Address and floor plan
- Rent and lease term
- Previous tenant’s trade
Confirm with
Landlord / agent
- Approved use of the unit
- Whether massage services are allowed
- Water points and drainage for treatment rooms
URA
- Approved use via the approved-use enquiry
URA lists barber shops, beauty salons and hairdressing salons as Shop (Services) use.
URA: Other shop examples (change of use) (checked 22 Nov 2026)HDB’s permissible trades for its shops include barber shops, beauty salons and hairdressing salons.
HDB: Permissible trades for HDB shops (checked 22 Nov 2026)URA’s approved-use enquiry costs $54.50 (incl. GST) per enquiry; replies are instant if the record is online, otherwise about 10 working days.
URA: Enquiry on approved use of premises — FAQ (checked 22 Nov 2026) -
7Check plumbing, power and ventilation before signing
Treatment rooms need sinks, hot water, good ventilation and enough power for steamers, towel warmers and any devices.
Confirm with
Landlord
- Water points and hot water capacity
- Electrical load
- Ventilation and air-conditioning
- Permission to build treatment rooms
- Reinstatement at lease end
-
8Negotiate and sign the lease
Negotiate a fit-out period and make sure the permitted use covers beauty and, if needed, massage services.
Confirm with
Landlord
- Permitted use clause
- Rent-free fit-out period
- Deposit and signage rights
- Insurance clauses
Licences and approvals
-
9Design treatment rooms, sinks and sterilisation area
Plan reception, consultation area, treatment rooms or beds, a sink in or near each room, a separate area to clean and sterilise tools, and product storage.
Gather
- Number of beds or rooms
- Equipment list with sizes and power
-
10Get landlord approval for fit-out
Submit drawings and contractor details before works start.
-
11Check fire safety submissions with a Qualified Person
Applies if How much renovation does the unit need? Moderate — new treatment rooms and plumbing / Major — bare unit
Ask your contractor whether works need SCDF plan approval or can be lodged as minor works.
SCDF states that minor works listed in its schedule do not require plan approval but are lodged by a Qualified Person (Registered Architect or Professional Engineer).
SCDF: Minor addition and alteration works (checked 22 Nov 2026) -
12Apply for a massage establishment licence
Applies if Will any treatment include massage (for example facial or shoulder massage)? Yes
Facials or treatments that rub, knead or manipulate the body need a Police massage establishment licence, and each therapist who gives massage needs approval. Treatments with no massage at all, such as manicures and light treatments, do not.
Gather
- URA or HDB planning approval for the premises
- Floor plan
- Details of each employee who will provide massage
Confirm with
Singapore Police Force
- Which licence category fits your premises (rooms or open concept)
- Approval for each employee
SPF defines massage as rubbing, kneading or manipulating the human body to relax muscle tension; manicure, pedicure, light, electric and vapour treatments and baths without any massage do not need a licence.
Singapore Police Force: Apply for a massage establishment licence (checked 22 Nov 2026)SPF lists Category 1 and 2 licences at $290 for one year, $50 per employee approval, and processing of approximately 4 weeks; URA or HDB planning approval is required.
Singapore Police Force: Apply for a massage establishment licence (checked 22 Nov 2026)SPF states that from 1 Dec 2026 open-concept massage establishments are no longer exempt and need a new Category 3 licence ($340 for 3 years or $510 for 5 years).
Singapore Police Force: Apply for a massage establishment licence (checked 22 Nov 2026) -
13Check rules before buying lasers or energy-based devices
Applies if Will you use lasers, HIFU, IPL or other energy-based devices? Yes
Some devices are controlled by NEA and some may only be used by doctors in clinics. Check before you buy or advertise any treatment.
Confirm with
Device supplier
- Laser class or device type
- Whether NEA licences are needed to possess or use it
NEA
- Licence requirements for the device
NEA states only registered medical practitioners may operate class 4 high-power lasers and HIFU apparatus on humans, at premises approved by MOH; suppliers should not supply these to beauticians.
NEA: Advisory on non-ionising irradiating apparatus in the beauty and aesthetic industry (checked 22 Nov 2026)NEA states class 4 lasers cannot be used in beauty salons; class 3b lasers need N2 (possession) and N3 (user) licences; IPL is not currently a controlled apparatus.
NEA: Frequently asked questions on lasers (checked 22 Nov 2026)
Fit-out
-
14Renovation and fit-out
Treatment rooms or partitions, plumbing for sinks, lighting, ventilation, reception and retail display.
Confirm with
Contractor
- Completion date
- Defects period
- Who handles authority submissions
-
15Set up utilities, internet and laundry
Utilities, internet for bookings, towel and linen laundry, and waste collection.
-
16Shopfront signage
Design signage and check landlord rules. Larger signs may need a BCA licence.
BCA exempts signboards totalling not more than 5m²; licence applications take about 7 working days, plus two weeks if URA must evaluate.
BCA: Outdoor advertising sign / signboard licence application (checked 22 Nov 2026)
Equipment, products and systems
-
17Order beds and beauty equipment
Treatment beds, facial steamers, magnifying lamps, towel warmers, trolleys, sterilisers and storage.
Confirm with
Equipment supplier
- Lead time
- Warranty and servicing
- Electrical safety for each item
-
18Choose professional skincare and retail products
Open accounts for professional and retail ranges. If you plan to sell your own-brand skincare, check HSA’s notification rules before launch.
Confirm with
Product supplier
- Trade pricing and minimum order
- Training on the range
- Whether retail products are notified with HSA
HSA states a cosmetic product notification usually needs to be submitted before the product can be sold, and re-notification is required after one year.
Health Sciences Authority (HSA): Cosmetic products — overview (checked 22 Nov 2026) -
19Set up bookings, client records and payments
Online booking with reminders, client consultation records, package balances and card or PayNow payments.
Confirm with
Software supplier
- Package and membership tracking
- Client consultation notes
- Monthly fee and payment rates
People and compliance
-
20Recruit beauty therapists
Applies if Will you hire therapists before opening? Yes
Recruit therapists, agree commissions, and set up CPF. Therapists who give massage need Police approval under your licence.
Employers pay CPF for Singapore Citizen and PR employees earning more than $50 a month.
CPF Board: How much CPF contributions to pay (checked 25 Nov 2026) -
21Set hygiene and sterilisation routines
Write cleaning, disinfection and sterilisation steps for tools, beds and linen, and train every staff member on them.
HealthHub publishes guidance for barbers, hairdressers and beauticians on preventing blood-borne infections.
HealthHub: Guidance for barbers, hairdressers and beauticians (checked 22 Nov 2026) -
22Write fair terms for prepaid packages
Applies if Will you sell prepaid packages? Yes
Show prices clearly before treatment, avoid pressure selling, and set out refund and expiry terms in writing. Consider voluntary CaseTrust accreditation.
CCS states beauty businesses must give clear and accurate information on prices before treatment, must not pressure customers, and must not make unsubstantiated claims.
Competition and Consumer Commission of Singapore (CCS): Fair trading practices for the beauty industry (checked 22 Nov 2026)CASE (not a government body) runs voluntary CaseTrust accreditation for spa and wellness businesses, which requires a 5-working-day cooling-off period and prepayment protection.
CASE (non-government): CaseTrust accreditation for spa and wellness businesses (checked 22 Nov 2026) -
23Arrange treatment and public liability insurance
Treatment liability (burns, allergic reactions), public liability, product liability for retail products, and work injury compensation for employees.
Confirm with
Insurer / broker
- Cover for each treatment and device you offer
- Public liability amount required by your lease
Which insurance is required, and what to consider for your sector →
Launch
-
24Website and pre-opening marketing
Set up a simple website with your treatment menu, prices, location and online booking, so customers can find you on Google. Avoid unproven treatment claims in your advertising.
-
25Install and test equipment
Test hot water in every room, each device on its circuit, and the booking flow end to end.
-
26Staff training and trial treatments
Run treatments on friends to time each one, practise consultation and aftercare advice, and check room turnaround.
-
27Soft launch
Take limited bookings to test flow before the full launch.
-
28Opening day
First day of trade.
Costs to budget for
| Upfront | Planning range |
|---|---|
| Security deposit (assumed 3 months’ rent) | S$12,000 – S$30,000 |
| Renovation and treatment rooms | S$30,000 – S$70,000 |
| Beds and beauty equipment | S$10,000 – S$35,000 |
| Design and professional fees | S$3,000 – S$8,000 |
| Opening professional and retail stock | S$3,000 – S$10,000 |
| Booking, POS and tablet set-up | S$500 – S$2,500 |
| Registration and enquiry fees | S$300 – S$1,500 |
| Massage licence and employee approvals | S$500 – S$1,500 |
| Package terms, accreditation and prepayment protection | S$1,000 – S$4,000 |
| Signage, branding and launch marketing | S$3,000 – S$10,000 |
| Recruitment and pre-opening wages | S$2,000 – S$6,000 |
| Insurance (first-year premium) | S$1,500 – S$4,000 |
| Monthly | Planning range |
| Rent (incl. service charge) | S$4,000 – S$10,000 |
| Therapist salaries and commissions incl. employer CPF | S$8,000 – S$25,000 |
| Professional products and consumables | S$1,500 – S$4,000 |
| Utilities and internet | S$700 – S$1,800 |
| Booking and software subscriptions | S$100 – S$400 |
| Marketing | S$800 – S$3,000 |
| Laundry, cleaning and waste | S$300 – S$900 |
| Accounting and bookkeeping | S$300 – S$800 |
Planning estimate Planning estimates by OpenReady SG, last reviewed 22 Nov 2026. They are not quotes or published prices — replace them with your own quotes.
What changes your plan
- Will any treatment include massage (for example facial or shoulder massage)?
- Massage services need a massage establishment licence from the Police.
- Will you use lasers, HIFU, IPL or other energy-based devices?
- Some devices are controlled by NEA and some may only be used by doctors.
- Will you sell prepaid packages?
- Adds fair-trading terms for package sales.
- How much renovation does the unit need?
- Changes renovation time, fire-safety checks and cost.
- Will you hire therapists before opening?
- Adds recruitment and CPF set-up, and each massage therapist needs Police approval.
Official sources
- ACRA: Choosing a business structure (checked 22 Nov 2026)
- URA: Other shop examples (change of use) (checked 22 Nov 2026)
- HDB: Permissible trades for HDB shops (checked 22 Nov 2026)
- URA: Enquiry on approved use of premises — FAQ (checked 22 Nov 2026)
- SCDF: Minor addition and alteration works (checked 22 Nov 2026)
- Singapore Police Force: Apply for a massage establishment licence (checked 22 Nov 2026)
- NEA: Advisory on non-ionising irradiating apparatus in the beauty and aesthetic industry (checked 22 Nov 2026)
- NEA: Frequently asked questions on lasers (checked 22 Nov 2026)
- Health Sciences Authority (HSA): Cosmetic products — overview (checked 22 Nov 2026)
- Competition and Consumer Commission of Singapore (CCS): Fair trading practices for the beauty industry (checked 22 Nov 2026)
- CASE (non-government): CaseTrust accreditation for spa and wellness businesses (checked 22 Nov 2026)
- HealthHub: Guidance for barbers, hairdressers and beauticians (checked 22 Nov 2026)
- CPF Board: How much CPF contributions to pay (checked 25 Nov 2026)
- IRAS: Do I need to register for GST? (checked 25 Nov 2026)
- BCA: Outdoor advertising sign / signboard licence application (checked 22 Nov 2026)