Open a student care centre in Singapore
How to open a student care centre in Singapore
Last reviewed: 22 Nov 2026 · Editorial standards
Student care centres in Singapore do not need a licence, but that does not mean there are no rules. Your premises still need URA or HDB approval and an SCDF fire safety certificate, and most parents will look for a centre that accepts Student Care Fee Assistance (SCFA). To offer SCFA you register with MSF and meet its standards on space, staff ratio, screening, programme and opening hours. This guide puts every step in order with official sources.
Decide and register
-
1Decide your schools, capacity and fees
Pick the primary schools you will serve (pick-up routes matter), your capacity and monthly fee. Decide whether to register with MSF for SCFA subsidies.
Gather
- Primary schools nearby
- Target capacity
- Monthly fee
MSF states there is no licensing regime for student care centres: school-based centres register with MSF, other centres register only if they want to administer Student Care Fee Assistance, and all must follow general law including the Children and Young Persons Act.
Ministry of Social and Family Development (MSF): Licensing and regulation of student care centres in Singapore (checked 25 Nov 2026)MSF reported a median monthly fee of $290 at SCFA-registered centres, with most charging $220–$450, and about 15% of enrolled students receiving SCFA.
Ministry of Social and Family Development (MSF): Breakdown of student care centres by operator type and SCFA registration (parliamentary answer, 7 Jul 2026) (checked 25 Nov 2026) -
2Set your budget and enrolment ramp-up
Most enrolment happens before the school year starts, so plan your opening around January and keep months of rent and salaries in reserve.
Gather
- Funding available
- Students needed to break even
-
3Register your business with ACRA
MSF registration asks for your ACRA Bizfile profile (or Registry of Societies record).
Gather
- Business name options
- Owner details
- Business address
ACRA lists a one-year sole proprietorship registration at $115 ($15 name application plus $100 registration).
ACRA: Choosing a business structure (checked 22 Nov 2026)Not a Singapore Citizen or PR? Starting a business as a foreigner →
-
4Open a business bank account
MSF pays SCFA subsidies by GIRO, so set up a business account early.
-
5Check whether you must register for GST
Compare your fee income forecast with the IRAS threshold.
GST registration is compulsory if taxable turnover exceeds $1 million at the end of a calendar year, or is expected to in the next 12 months.
IRAS: Do I need to register for GST? (checked 25 Nov 2026)
Premises
-
6Find premises near your target schools
Look near the schools you serve. Check the unit’s approved use before you negotiate.
Gather
- Address and floor area
- Distance to schools
- Rent and lease term
URA classifies student care centres under “childcare centre”; residential units in mixed developments are not allowed, and landed houses need a change of use application.
URA: Change use of property for business: assessment criteria (checked 25 Nov 2026)URA needs no planning permission for a childcare centre in commercial buildings, commercial parts of mixed developments, HDB void decks and several other building types, if there are no special planning restrictions and the centre is under 50% of the development’s floor area.
URA: Authorisation conditions for childcare centres (checked 25 Nov 2026)HDB lists “Student care centres” as a permissible trade for HDB commercial units.
HDB: Permissible trades for HDB shops (checked 22 Nov 2026) -
7Check the space and capacity
Work out capacity from usable floor area, and check there is room for study and activity areas, toilets and a shower.
Confirm with
Landlord
- Toilets and a shower can be provided
- Kitchen space if cooking
- Reinstatement at lease end
MSF’s SCFA terms set maximum occupancy at usable floor area (m²) divided by 3 — excluding kitchen, store, toilets, office and sick bay — and require a study area, activity area, bathroom with shower and toilets.
Ministry of Social and Family Development (MSF): Terms and conditions for student care centres appointed as SCFA administrators (PDF, Nov 2025) (checked 25 Nov 2026) -
8Negotiate and sign the lease
Ask for an exit clause if URA or HDB approval is refused, and rent-free time for approvals and renovation.
Confirm with
Landlord
- Exit clause if approval is refused
- Rent-free period
- Deposit and signage rights
Approvals
-
9Get URA or HDB approval for the premises
HDB shops need HDB’s prior approval; landed houses need a URA change of use; most commercial buildings need no planning permission.
HDB processes a change of use in at least 4 weeks after all documents and payment are received; tenants of HDB rental shops apply through GoBusiness.
HDB: Change of use: application process (checked 25 Nov 2026)URA’s change of use fee is $500 (non-refundable) and assessment generally takes 10 working days.
URA: Changing the use of your property (checked 25 Nov 2026) -
10SCDF fire safety plans and certificate
Converting a unit to student care changes fire safety requirements. A Qualified Person submits plans; you need a Fire Safety Certificate (or temporary fire permit) before occupying.
SCDF requires plan approval before fire safety works or a change of use affecting fire safety, submitted by a Qualified Person; the fee is $90 per storey for a change of use with no added floor area.
Singapore Civil Defence Force (SCDF): Plan approval (checked 25 Nov 2026)SCDF requires a Fire Safety Certificate before the premises are occupied; there is no fee and SCDF responds within 3 working days.
Singapore Civil Defence Force (SCDF): Fire Safety Certificate and Temporary Fire Permit (checked 25 Nov 2026)MSF’s SCFA terms require HDB or URA approval for the premises and an SCDF Fire Safety Certificate or Temporary Fire Permit.
Ministry of Social and Family Development (MSF): Terms and conditions for student care centres appointed as SCFA administrators (PDF, Nov 2025) (checked 25 Nov 2026) -
11Register with MSF as an SCFA administrator
Applies if Will you register with MSF to accept SCFA subsidies? Yes — register as an SCFA administrator
Submit MSF’s online form with your GIRO form, Declaration of Offences and ACRA profile. Registered centres must meet MSF’s minimum standards and are audited.
Gather
- Interbank GIRO form
- Declaration of Offences form
- ACRA Bizfile profile
MSF registers SCFA administrators through an online form with an Interbank GIRO form, a Declaration of Offences form and the ACRA Bizfile profile; registered centres must meet minimum requirements on environment, health, safety, supervision and programming, and are audited.
Ministry of Social and Family Development (MSF): Register as an SCFA administrator (checked 25 Nov 2026)MSF’s SCFA terms require at least 10% of enrolled students to be on SCFA, the same fee for all students in the same programme and school year, and fee changes submitted by 30 September of the year before.
Ministry of Social and Family Development (MSF): Terms and conditions for student care centres appointed as SCFA administrators (PDF, Nov 2025) (checked 25 Nov 2026)MSF’s SCFA terms require 6-monthly reports, serious incidents reported within 12 hours, and records kept for 3 years; MSF can stop subsidies or revoke administrator status for non-compliance.
Ministry of Social and Family Development (MSF): Terms and conditions for student care centres appointed as SCFA administrators (PDF, Nov 2025) (checked 25 Nov 2026)
Fit-out
-
12Renovate study and activity areas
Study area, activity area, toilets and shower, kitchen or pantry, sick corner and storage, built to the approved fire safety plans.
Confirm with
Contractor
- Works follow the approved plans
- Child-safe finishes
- Completion date
-
13Order furniture, books and activity equipment
Study tables and chairs, bookshelves, activity and play equipment, lockers and first-aid supplies.
-
14Signage
Larger signs may need a BCA licence.
BCA exempts signboards totalling not more than 5m²; licence applications take about 7 working days, plus two weeks if URA must evaluate.
BCA: Outdoor advertising sign / signboard licence application (checked 22 Nov 2026)
Staff and programme
-
15Recruit care staff and teachers
Recruit enough programme staff for your enrolment, with first aid training, and arrange each person’s pre-employment medical check.
MSF’s SCFA terms require a programme staff-to-student ratio of at least 1:25, at least one first-aid-trained staff member on hand at all times, and a pre-employment medical check (physical exam and chest X-ray) for every staff member.
Ministry of Social and Family Development (MSF): Terms and conditions for student care centres appointed as SCFA administrators (PDF, Nov 2025) (checked 25 Nov 2026)Employers pay CPF for Singapore Citizen and PR employees earning more than $50 a month.
CPF Board: How much CPF contributions to pay (checked 25 Nov 2026) -
16Plan the daily programme and opening hours
Plan pick-ups from school, meals, homework supervision, activities and shower time, and your opening hours on weekdays, Saturdays and school holidays.
MSF’s SCFA terms require care of at least 3 hours a day and a displayed timetable covering meals (lunch and tea, and breakfast if applicable), shower time if applicable and homework supervision.
Ministry of Social and Family Development (MSF): Terms and conditions for student care centres appointed as SCFA administrators (PDF, Nov 2025) (checked 25 Nov 2026)MSF’s SCFA terms require community-based centres to open Monday to Friday from 7.30am or earlier to 7pm or later, and Saturday from 7.30am or earlier to 1.30pm or later, closing on Sundays and public holidays.
Ministry of Social and Family Development (MSF): Terms and conditions for student care centres appointed as SCFA administrators (PDF, Nov 2025) (checked 25 Nov 2026) -
17Screen staff and set a child-safe policy
Collect a declaration of offences from every staff member, volunteer and vendor, and write a code of conduct and child-safe policy. Do this even if you do not register with MSF.
MSF’s SCFA terms require a Declaration of Offences from all staff, volunteers and vendors, background checks through MSF for anyone with prolonged contact with students, no hiring of anyone convicted, warned or under investigation for offences of dishonesty or moral turpitude, and a code of conduct and child-safe policy.
Ministry of Social and Family Development (MSF): Terms and conditions for student care centres appointed as SCFA administrators (PDF, Nov 2025) (checked 25 Nov 2026) -
18Kitchen, menus and food licence
Applies if Will you cook meals on site? Yes — own kitchen
Plan menus and kitchen staff, and confirm with SFA whether your kitchen needs a food shop licence.
SFA requires a Food Shop Licence for kitchens and canteens in private educational institutions.
Singapore Food Agency (SFA): Businesses that need a licence/permit for food retail (checked 22 Nov 2026) -
19Arrange insurance
Public liability, personal accident cover for students, contents, and work injury compensation for employees.
Which insurance is required, and what to consider for your sector →
Systems
-
20Set up enrolment, attendance and parent app
Enrolment, daily attendance and pick-up records, billing and subsidies, and parent messaging.
-
21Set fees and explain SCFA to parents
Publish your monthly fee and help eligible parents apply for SCFA on SupportGoWhere.
SCFA gives eligible families up to $290 a month plus a one-time start-up grant of up to $400; both parents must work at least 56 hours a month and gross household income must be $4,500 or less ($6,500 from 1 Jan 2027).
SupportGoWhere (MSF): Student Care Fee Assistance (SCFA) (checked 25 Nov 2026)
Enrolment and launch
-
22Website, Google listing and parent open house
Parents choose before the school year. Set up a website with fees, schools served and daily programme, and hold open houses.
-
23Centre opens
First students attend.
Costs to budget for
| Upfront | Planning range |
|---|---|
| Security deposit (assumed 3 months’ rent) | S$12,000 – S$36,000 |
| Renovation, toilets and shower | S$20,000 – S$60,000 |
| Furniture, books and activity equipment | S$5,000 – S$20,000 |
| URA/HDB, SCDF and Qualified Person fees | S$2,000 – S$8,000 |
| ACRA registration | S$115 – S$700 |
| Recruitment, medical checks and pre-opening salaries | S$3,000 – S$12,000 |
| Insurance (first-year premium) | S$1,500 – S$5,000 |
| Website, signage and open houses | S$2,000 – S$8,000 |
| Monthly | Planning range |
| Rent (incl. service charge) | S$4,000 – S$12,000 |
| Care staff and teacher salaries incl. CPF | S$8,000 – S$30,000 |
| Meals (food and cook, or catering) | S$2,000 – S$8,000 |
| Utilities and internet | S$600 – S$2,000 |
| Enrolment and parent app subscription | S$50 – S$400 |
| Activity materials and consumables | S$300 – S$1,500 |
| Accounting and bookkeeping | S$300 – S$800 |
Planning estimate Planning estimates by OpenReady SG, last reviewed 22 Nov 2026. They are not quotes or published prices — replace them with your own quotes.
What changes your plan
- Will you register with MSF to accept SCFA subsidies?
- Registration is optional, but many parents rely on Student Care Fee Assistance. Registered centres must meet MSF’s standards and are audited.
- Where will the centre be?
- URA treats student care like a childcare centre: no planning permission in commercial buildings and HDB void decks, HDB approval in HDB shops, and a change of use for landed houses.
- Will you cook meals on site?
- Student care usually includes lunch and tea; cooking on site may need an SFA licence.
- How much renovation does the unit need?
- You need study and activity areas, toilets and a shower.
Official sources
- Ministry of Social and Family Development (MSF): Licensing and regulation of student care centres in Singapore (checked 25 Nov 2026)
- Ministry of Social and Family Development (MSF): Breakdown of student care centres by operator type and SCFA registration (parliamentary answer, 7 Jul 2026) (checked 25 Nov 2026)
- ACRA: Choosing a business structure (checked 22 Nov 2026)
- URA: Change use of property for business: assessment criteria (checked 25 Nov 2026)
- URA: Authorisation conditions for childcare centres (checked 25 Nov 2026)
- HDB: Permissible trades for HDB shops (checked 22 Nov 2026)
- Ministry of Social and Family Development (MSF): Terms and conditions for student care centres appointed as SCFA administrators (PDF, Nov 2025) (checked 25 Nov 2026)
- HDB: Change of use: application process (checked 25 Nov 2026)
- URA: Changing the use of your property (checked 25 Nov 2026)
- Singapore Civil Defence Force (SCDF): Plan approval (checked 25 Nov 2026)
- Singapore Civil Defence Force (SCDF): Fire Safety Certificate and Temporary Fire Permit (checked 25 Nov 2026)
- CPF Board: How much CPF contributions to pay (checked 25 Nov 2026)
- Singapore Food Agency (SFA): Businesses that need a licence/permit for food retail (checked 22 Nov 2026)
- Ministry of Social and Family Development (MSF): Register as an SCFA administrator (checked 25 Nov 2026)
- SupportGoWhere (MSF): Student Care Fee Assistance (SCFA) (checked 25 Nov 2026)
- IRAS: Do I need to register for GST? (checked 25 Nov 2026)
- BCA: Outdoor advertising sign / signboard licence application (checked 22 Nov 2026)